AI-Control in Delitzsch

Source: https://www.delitzsch.de/portal/seiten/schwimmbad-900000121-27640.html

The new pool building in Delitzsch will be equipped with HANSA Pool Line dehumidification units and our etaSmart KI Control

 

A new swimming pool will be built in Delitzsch by 2024.

We are proud that we got the contract for the supply of the ventilation units.

The swimming pool dehumidification unit with an air performance of 14,000 m³/h is equipped with a highly efficient heat recovery and additionally with a heat pump for further utilization of the residual energy. The heat pump is running with an efficient digital scroll compressor for high effizient part load operation.

We will also integrate our energy monitoring system etaWatch here, as well as our AI-based model-based control etaSmart, so that this unit can be operated with the highest efficiency.